November 9, 2026
AWD Capacity Splits Into Two Pools β Increase Requests Close 4 December
Amazon Seller Central announcement: 9 November 2026
Amazon has split AWD base capacity into two separate pools β palletizable facilities and standard facilities β each measured in cubic feet and each checked on its own. Unused space in one pool does not offset a shortage in the other.
Enforcement starts 7 January 2027. The window to ask for more closes 4 December 2026. That is the date to act on.
1. The Calendar
| Date | What happens |
|---|---|
| 9 November 2026 | Base capacity split into two pools; increase request window opens |
| 4 December 2026 | Deadline to submit a base capacity increase request |
| By 7 January 2027 | Approved increases appear in Capacity Manager; denials sent by email |
| 7 January 2027 | Maximum capacity limits begin to be enforced |
| 1 February 2027 | Commitment-based billing begins for storage reservations |
2. How Enforcement Works
Amazon compares your on-hand inventory plus open AWD shipments against your base allocation plus any active storage reservation, pool by pool. A shipment that would push you past the applicable limit is blocked.
Note that open shipments count. A cancelled plan you never closed is consuming capacity you will want in January. Base allocations are derived from your historical AWD usage and reviewed quarterly.
3. Requesting an Increase
Requests go by email to awd-capacity-management@amazon.com with the subject line: AWD base capacity allocation increase request.
Amazon will not consider incomplete requests. Include all of the following:
- Your MCID.
- Current and requested capacity, stated separately for each facility type.
- The reason for the increase.
- A six-month shipment plan with SKU or ASIN detail.
4. Storage Reservations and the February Billing Change
- Minimum reservation size is 1,000 cubic feet at a specific facility.
- A reservation must start at least three weeks after the request.
- Terms run from 4 to 26 weeks.
- One reservation per pool.
Until 1 February 2027 you pay only for space you actually use. From that date, reservation fees are based on committed volume β including reservations made in 2026 that run into 2027.
That last clause is the trap. A generous reservation booked in December on pay-for-what-you-use terms becomes a commitment you are billed for in February. Size reservations to volume you genuinely expect to use, not to the headroom you would like.
5. What to Do Before 4 December
- Open Capacity Manager in Seller Central and check base allocation, utilisation and remaining space on both the Palletizable and Standard facilities tabs.
- Map your planned JanuaryβMarch inbound against each pool separately, not as one total.
- Cancel open AWD shipments you no longer intend to send β they are counting against you.
- Submit a complete increase request by 4 December if either pool is tight.
- Book reservations against realistic volume, given commitment billing from 1 February.
Is Your AWD Capacity Going to Block Q1 Inbound?
Our Amazon agency can check both capacity pools against your Q1 shipment plan and put together a complete increase request before the 4 December deadline.